Substation Meter & CT testing

Join us on Tuesday, April 21 at 11am EDT as we walk through Substation Meter and CT Testing.
We will cover:

  1. Using a PowerMaster 7 Series
  2. Verifying connections
  3. Running a Phantom Load Meter test
  4. Performing a CT Burden + Ratio Test using the HV probe
  5. Running a Phantom Load Meter Test on a panel meter